Experience
Industrial
Facilities -
Repair Concrete Floor, Service Galleries, and Pre-Determined
Concrete Areas (75CF), Remove Pre-Determined Spall (5000CF),
and Replace Floor Drains, Drydock No. 1, Naval Shipyard, Pearl
Harbor, Oahu, Hawaii
Location: Naval Shipyard, Pearl Harbor, Oahu, Hawaii
Contract Value: $5.1 Million
Client: U.S. Navy
The work under this high visibility project consisted of
(6) phases, which included demolition, repair, and replacement
work at Drydock 1. Phase I–III involved the demolition
of the drainage rails from Dock Mark 53 to Dock Mark 500,
concrete removal for the new drainage trenches, and spall
repair. Phase IV involved work to construct the main drainage
trenches on the port and starboard side, which included placement
of form work; performing grading checks; placement of epoxy
coated reinforcing steel bars; placement of monel grating
frames; application of epoxy bonding agents; pumpwell and
drain inlet connections; and concrete placement with accelerated
curing agents. Phase V-VI involved concrete repair of the
spalled areas on the walls and service galleries, and finished
work including the installation of concrete embedded brass
survey pins.
The success of this project resulted in a letter of appreciation
from the Drydock Engineering Office for outstanding performance.
Awards
|