Contract Value: $15.9 Million
Client: Department of the Navy
This design-build project involved the modernization of five
existing three-story concrete buildings (Buildings 1333A,
1333B, 1369, 1370, 1490) to 2+0 standards for a total of 175
double occupancy modules. Construction work involved the conversion
of the first floor lounges into four additional living units;
construction of covered mailboxes and a new recreation area;
replacement of doors, windows, ceilings, floor tiles, and
wall coverings; removal and disposal of asbestos containing
floor tiles; lead paint removal; removal of an existing diesel
tank, including removal and clean-up of associated contaminated
soil; new asphaltic concrete basketball court and roads; new
corridor railings; hot water boiler and pipe insulation for
one building; addition of structural walls/footings to meet
current Navy seismic requirements; re-installation of card
reader door locks; ADA compliant units in specified buildings;
and a new Recreation Building with full kitchen.
|